Progress Energy Florida, Inc., Crystal River, FL


CTT served as a sub-consultant on Units 4 and 5 SCR/FGD duct support and pipe rack systems. CTT supported Burns & McDonnell, the lead engineering firm by providing structural design of the duct supports with Chemtex International.  The structure was designed using a 3D model and required coordination with several vendors.  The 31’ diameter ducts are located 130’ above grade and extend from the new respective absorber equipment to the new stack.  Structural engineering was provided by CTT for the expansion joint access platforms that extend up and over the duct. CTT also provided engineering on foundations for several new tanks, equipment, utility trenching and a 180’ x 100’ mat foundation for a tank farm.

Shown is the unit 5 partial duct support steel under construction.