Dual Train Chemical Plants, Confidential Client, USA

CTT served as Structural Engineer of Record on two new dual train chemical plants.  CTT supported the prime consultant located in the Midwest by performing a structural liaison role with the international sub-consultant.  CTT was responsible for the creating the project design basis, final structural design, and review of structural shop drawings.  Project requirements included travel to the prime consultant’s location and to the sub-consultant’s locations overseas.  Drawings were extracted from Owner approved 3D model.

 

Plant 1: Product Storage Capacity of 1,250,000 gal; 5 Layer pipe rack extending over 900 feet; Approximately 1500 tons of steel; Multiple independent equipment foundations; Multiple equipment mat foundations; Multiple elevated steel structures; Multiple elevated equipment supports; 150 foot cantilevered stack foundation.

 

Plant 2: Product Storage Capacity of 925,000 gal; 3 Layer pipe rack extending over 600 feet; Approximately 700 tons of steel; Multiple independent equipment foundations; Multiple equipment mat foundations; Multiple elevated steel structures; Multiple elevated equipment supports; (2) 130 foot cantilevered stack foundation.

 


CLOSE

Copyright © 2010 Criser Troutman Tanner Consulting Engineers
All Rights Reserved | Privacy Policy |
Webmaster