Campbell Soup Supply Company Plastic Line Addition, Maxton, NC

CTT provided civil and structural engineering services to Campbell Soup Supply Company under a design–build contract for the construction of the 19,000 SF plastic line building addition (shown above just after installation of the concrete panels). The new facility will house new cooking equipment, conveying equipment, pipe racks, a new HVAC penthouse, control room, and electrical and mechanical rooms. The new equipment will be supported by a high capacity slab utilizing a two-way concrete slab cast on driven timber piles. 

 

The project also consisted of the design of a new 4,100 SF de-palletizer building for offloading pallets and plastic line containers. Included under separate contracts with Campbell Soup, CTT provided structural engineering services for in-plant pipe bridges for utility routing, equipment relocation and support, mezzanine repair, boiler house modifications, new equipment installation, de-palletizer and palletizer platforms, and multiple analyses and consultations in support of the new plastic line. 


CLOSE

Copyright © 2010 Criser Troutman Tanner Consulting Engineers
All Rights Reserved | Privacy Policy |
Webmaster