|
Royal Palm Drive, Waterford Plantation, Timber Access Bridge, Leland, NC
|
|
|
CTT
provided
structural engineering services to design a 96’ long, two-lane, AASHTO HS20
design loading, timber access bridge. The two lanes provide a 22’ clear
roadway width. Timber bridge beams span in the longitudinal directions
across timber caps spaced at 11’-0” on center. Each cap consisted of five
driven timber piles, of which the outer piles are battered. Guardrails and
curbing systems are provided on each side of the bridge.
|