First Baptist Church of Wilmington Steeple Replacement, Wilmington, NC

          

CTT provided design phase services to perform a full structural analysis and final design documents for the reconstruction of  the 197-foot high main steeple, as well as provided repairs to a smaller, 127-foot steeple, which were both damaged by Hurricane Fran in 1996. Repairs consisted of new multi-wythe brick masonry walls constructed over original walls, a new steel spire structure, provisions for attaching new treated plywood sheathing over structure to allow slate shingle roofing with copper flashing and louvers, stained glass repair, steeple finial, electrical wiring and lighting, sidewalk and curbing replacement, and landscaping. CTT also provided full construction phase services. 

 

In August 1999 the church received the Gertrude S. Carraway Award of Merit from Preservation North Carolina for its commitment to promoting historic preservation. The organization sited the church as one of Wilmington’s most significant historic buildings and holds a key place in this port city’s history.

 

 

 


CLOSE

Copyright © 2010 Criser Troutman Tanner Consulting Engineers
All Rights Reserved | Privacy Policy |
Webmaster