Riverwalk Marina, Cape Fear River, Wilmington, NC

 

CTT provided complete structural, civil and marine engineering for the design of a new marina, which included demolition, dredging, earthwork, bulkheads, floating docks, piling, fueling facilities, sitework, water, sewer pumpout, stormwater systems, landscaping, irrigation and extending the Wilmington Riverwalk. Services also consisted of extending landbased utilities to the marina as well as for future development on the site.

CTT was engaged by Almont Shipping Co. to provide long-term planning for relocating its deep-water steamship terminal from a downtown site where it had operated for almost a century, handling bulk agricultural and construction materials. Services included planning a phase transition from an operating ship (originally steamship) terminal to a large Pleasure Boat Marina with high-rise office, commercial and residential development.

The most significant feature of the marina layout is the provision for the City’s linear river-side edge Riverwalk around the boating environment. The marina design required coordination with the construction of a new city Convention Center on the south side and to extend the Riverwalk northward.

CTT provided all services for preparation of local and State permit applications for Stormwater Management and for the CAMA Major Permit for the Division of Coastal Management. CTT worked closely with the Owner’s Architect. Full Bid and Construction Phase Services will also be provided.


CLOSE

Copyright © 2010 Criser Troutman Tanner Consulting Engineers
All Rights Reserved | Privacy Policy |
Webmaster