Waterway Palms Plantation Bulkhead and Boat Ramp, Myrtle Beach, SC


 

CTT provided complete structural and marine engineering for the design of approximately 4,720 LF of vinyl bulkhead with an aluminum cap and a treated timber drop waler with a mechanical anchor system and sloping backfill along the AIWW. The project also included design of transition walls at adjacent property as well as design of a boat ramp consisting of a concrete ramp above the HWL and the lower portion below the MLW consisting of an articulated concrete ramp. Services also included preparing and applying for US Army Corps of Engineers/SCDHEC/OCRM permits for staging and community docks, boat ramp and dredging for such as well as joint-use docks. Construction phase services were provided with periodic construction observation.