Carolina Waterway Plantation Bulkhead Wall & Boat Ramp, Myrtle Beach, SC

CTT provided complete marine engineering design and construction administration of approximately 4,100 LF of vinyl bulkhead. The bulkhead was designed with a timber cap, timber drop waler with a mechanical anchor system and sloping backfill along the AIWW, and a boat ramp. The project also included designing transition walls at adjacent property as well as at the boat ramp that consisted of a concrete ramp with an articulated concrete ramp below MLW. CTT also secured the dock master plan permit and boat ramp permit from the US Army Corps of Engineers and SCDHEC-OCRM.