CTT provided
complete
marine engineering design and construction administration of approximately
4,100 LF of vinyl bulkhead. The bulkhead was designed with a timber cap,
timber drop waler with a mechanical anchor system and sloping backfill
along the AIWW, and a boat ramp. The project also included designing
transition walls at adjacent property as well as at the boat ramp that
consisted of a concrete ramp with an articulated concrete ramp below MLW.
CTT also secured the dock master plan permit and boat ramp permit from the
US Army Corps of Engineers and SCDHEC-OCRM. |