The Battery on the Waterway Bulkhead Wall, Boat Ramp Staging and Community Docks, Myrtle Beach, SC

CTT provided complete structural and marine engineering for the design of approximately 3,400 LF of vinyl bulkhead with a coated aluminum cap and treated timber drop waler with mechanical anchor system and sloping backfill along the AIWW.  Project also included design of transition walls at adjacent property as well as design of a boat ramp, consisting of a concrete ramp above the HWL and the lower portion below the MLW consisting of an articulated concrete ramp along with a staging dock. Two community docks were also provided along with the associated dredging for all amenities. These amenities serves single-family units as well as a multi-family tract. 


CLOSE

Copyright © 2010 Criser Troutman Tanner Consulting Engineers
All Rights Reserved | Privacy Policy |
Webmaster