United Therapeutics Biotech Facility, Research Triangle Park, NC


 

 

 

CTT provided civil & structural design services for this grass roots Biotech facility.  The two-story, 200,000 SF facility will house production, packaging and warehouse operations, research & development labs, and general administrative offices.  A circular auditorium and elliptical front entrance were also designed as rigid frames using structural tube shapes.  Structural design also included support of equipment vital to the production process.

 

Civil services for the development of the 35 acre site consisted of designing the site layout, grading, erosion control, stormwater management, water & sewer utilities, and assistance with critical permitting efforts.  Planned future additions were taken into account during the design and layout of the site to allow for smooth and efficient expansion.

 

Stormwater regulations were satisfied by designing two detention basins for  management of runoff.  The stormwater system was also designed for future build-out of the site in order to reduce future permit modifications.  Existing intermittent streams and FEMA floodplains on-site had to be taken into account in the design.  This fast-track project involved close coordination with the Owner, Architect, and Durham County Permitting Agencies. 


CLOSE

Copyright © 2010 Criser Troutman Tanner Consulting Engineers
All Rights Reserved | Privacy Policy |
Webmaster